Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company
Main Markets:
South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia
Terms of Payment:
LC, T/T, D/P, Western Union
Average Lead Time:
Peak season lead time: 1-3 months
Off season lead time: one month
International Commercial Terms(Incoterms):
FOB, CIF
OEM/ODM Service
Sample Available

Traction Machine, Geared Machine, Traction Motor manufacturer / supplier in China, offering Torin Vvvf Geared Traction Machine, Elevator Parts (OS112-YJ180), Elevator Gearless Quiet Traction Machine for Small Machine Room, Low Noise, Car Switch, Lift Single Wheel Switch, Elevator Limit Switch, Elevator Parts, High Quality (OS27-M03/04) and so on.

Gold Member Since 2017
Audited Supplier
Supplier Homepage Products Traction System Traction Machine Torin Vvvf Geared Traction Machine, Elevator Parts (OS112-YJ180)

Torin Vvvf Geared Traction Machine, Elevator Parts (OS112-YJ180)

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $2,000-3,000/ Piece
Port: Shanghai, China
Transport Package: Standard Export Package
Payment Terms: L/C, T/T, Western Union
Type: Driving System
Load Capacity: 1000kg
Persons: 6-10
Speed: 1.00-2.00m/s
Drive Mode: AC
Control Type: Microcomputer Control

You Might Also Like

Loading...

Basic Info

Model NO.: OS112-YJ180
Lift Mechanism: Telescoping Lift
Use of Occasions: Indoor Type
Guide Rail: T Guide
Voltage: 3pH 380V/ 3pH 220V
Roping: 1:1
Brake: DC110V
Trademark: Ostar
Origin: China
HS Code: 84313100

Product Description

Details:
Torin Vvvf Geared Traction Machine, Elevator Parts (OS112-YJ180)
Control: VVVF
Brake: DC110V, 1.1A
Weight: 430kg
Max. Static Load: 3500kg


Specification:
Load (kg)Lift Speed (m/s)RatioSheave Dia. (mm)Rope Sheave (mm)Motor Power (kw)Pole
6300.7547:1Φ4804*12 (pitch 18)5.54
1.036:16.4
1.547:29

Shipment:
Torin Vvvf Geared Traction Machine, Elevator Parts (OS112-YJ180)

FAQ
Q1: What is the lead time of your traction machine?
Our lead time is within 25 working days upon receipt of down payment and confirmed technical documents. 
Q2: What is your payment term?
Our payment term is 30% down payment by T/T in advance and balance payment paid before shipment.
Q3: What is the guarantee for your elevator?
Our guarantee period is one year; but not includes damage caused by the human reason or force majeure.
Q4: Do you have any certificate for your products?
Yes, we have ISO and CE certificate for spare parts.

 

Send your message to this supplier

*From:
*To:
avatar Ms. Mandy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now